Green Street 페이지


스킵네비게이션



서브이미지

공원시설 서브메뉴

문서위치

Home Park facilities > Green Street

Green Street

가로녹지 시작

Street Greening Project
  • 246㎞ of street with 91 trees more than 20m of width
  • 31 traffic islands, 14 center guards and 16 small parks at the sides of street
  • 118.94㎞ of forest wall, 59 street flower gardens installed at the street side
  • 317,303㎡ of lawn inside the facilities for management such as downtown park,
    green street and Dongcheon Gymnasium.
  • Munsu Stadium, sub stadium, 19,027㎡ of Korean paper type lawn in the 1st and
    2nd small tree nursery field.
  • Landscape facilities in Industry Tower Rotary, Sinbok Rotary, Taehwa Rotary
 

View another photo

  • Street Greening Project

    Street Greening Project

  • Street Greening Project

    Street Greening Project

  • Street Greening Project

    Street Greening Project

Management target

Our corporation has exerted the best effort to maintain growing condition for the trees and building the beautiful and pleasant green environment at the city center. Intensive maintenance working has been performing for the landscape trees such as the street trees, forest wall, traffic island, street flower garden and park to show the aesthetic urban environment to the domestic and foreign visitors for preparing the National Sports Festival which will be held on 2015.

Manpower and vehicle status

28 persons of 5 sections for exclusive manpower for green land management are on constant alert for maintenance. 8 vehicles are maintained including 1 water spray car, 1 pesticide spray car and 1 car for elevated working. 2 wood crushers are possessed.

Status of trees

Various planted 611,368 trees on 166 green facilities are consigned such as street trees in 53 routes, 45 routes of 389.922 forest walls, 16 traffic island, 29,869 trees in 12 center guards, 50,711 trees in 13 small parks and 57,912 trees in 28 street flower gardens.

Tree management

  • Tree management work
    • Tree management work
      Subject Details of working Working period Contents
      Tree shaping.tree modifying work *More than 20m of road width
      - Trees in street, traffic island, center guard
      *November ~ next February in every year *Remove dead branch,
      *sprout,succulent shoot
      Fertilizing " *Spring fertilizer Feb~May
      *Autumn fertilizer Oct~Dec
      *Special fertilizer(Nutrient): Randomly
      *Use of organic fertilizer, compound fertilizer, micro amount fertilizer, liquid organic fertilizer.
      *Weak tree selective fertilizing
      Pest control " *March~November *Pest control on diaspididae, pine bark beetle, aphid, mites, etc.
      Wood post maintenance " * Throughout the year *Change and maintain the rotten, damaged wood post
      *Supporting the street tree with wood post against typhoon
      *Withdraw of the old wood post more than 3 years of installation.
  • Green ara management work
    • Green ara management work
      Subject Details of working Working period Contents
      Weeding *More than 20m of road width
      -Sidewalk, traffic island, street flower garden and weeds in center guard
      *March ~ October *Pesticide spray in weed creation area or weeding by deploying manpower
      Watering *More than 20m of road width
      -Street trees, traffic island, street flower garden and trees in center guard
      *High temperature and dry
      *Draught
      *Water spray with self spray vehicle, rent spray vehicle, fire extinguisher
      *Water pocket attachment on main tree and independent tree.
      Removing the contaminated soil and lying the wood chip " *April~August *The contaminated soil in tree planting stand and forest wall
      *10cm lying the self produced wood chip
      *Inhibiting the moisture evaporation and weed creation
      Management and operation of fountain * Green area and facility in Industry Tower Rotary and Sinbok rotary *년중 *Fountain cleaning and facility maintenance
      *Tree management in green land


스킵네비게이션